Switchboard installation and commissioning staged around a live, uninterruptible load.
Data Center · Electrical
LV switchgear install without a single outage

The challenge
The load was uninterruptible; a single outage was not an option.
The result
Full LV switchgear installed and commissioned without a single outage.
Scope
Switchboard installation and commissioning on a live site.